Section 01 COMMON ITEMS 1 025323 1.000 LS MOBILIZATION / 2 025324 1.000 LS TRAFFIC CONTROL / 3 070580 1.000 HOUR $30.000 $30.00 FLAGGER (SET PRICE) / 4 025600 1.000 EACH FIELD OFFICE AND LABORATORY (TYPE A) / 5 020001 1.000 LS $4,000.000 $4,000.00 MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE) / Section 01 Total $4,030.00 Section 02 ASPHALT SURFACING ITEMS 6 060241 18906.000 TON HMA OVERLAY (SR-12.5A) (PG 70-28) / 7 081699 18906.000 TON QUALITY CONTROL TESTING (HMA) / 8 010256 49.000 TON EMULSIFIED ASPHALT (SS-1HP) / 9 080465 1.000 TON $250.000 $250.00 MATERIAL FOR HMA PATCHING (SET PRICE) / 10 011750 1.000 EACH $50.000 $50.00 ASPHALT CORE (SET PRICE) / 11 000063 1.000 EACH $1.000 $1.00 ASPHALT AIR VOID PAY ADJUSTMENT / 12 000062 1.000 EACH $1.000 $1.00 ASPHALT DENSITY PAY ADJUSTMENT / 13 081773 18906.000 TON MILLING / 14 081050 1792.000 TON PAVEMENT EDGE WEDGE (ROCK) / 15 011478 1.000 MGAL $40.000 $40.00 WATER (EARTHWORK COMPACTION) (SET PRICE) / 16 070912 633.100 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE I) / Section 02 Total $342.00 Section 03 RUMBLE STRIPS 17 032406 564.200 STA. RUMBLE STRIPS (MILLED) (ASPHALT) (CENTERLINE) / 18 072252 1128.300 STA. RUMBLE STRIPS (MILLED) (ASPHALT) /