The purpose of this project is to perform upgrades to the envelope of the existing building and provide limited interior renovation. The envelope upgrades include installing a new PVC roof system over the original metal roof. Any existing skylights or ridge vents will be removed. New gutters and downspouts will terminate into existing drainpipes per site configuration. Other envelope upgrades include replacement of thirteen (13) remaining original windows with new windows and replacement of six (6) exterior doors. The interior work consists of new LVT flooring with new resilient base in two open offices. Two adjacent restrooms will have the plumbing fixtures replaced and new epoxy flooring with epoxy base. Two (2) interior doors and frames will be replaced with new. One of the restrooms will be outfitted for ADA accessibility, while the other will have the toilet partition replaced. The two front entries will have new replacement canopies, with a new canopy added at the rear of the building. Project does not include any electrical work.