Jaguar Stadium, Trojan Stadium, Andover High School, Andover Middle School - Remove grass and debris and seal cracks ¼” to 1” wide with hot pour crack and joint sealant. Use backer rod on cracks deeper than ¾” deep to prevent sealant sagging - Remove and replace asphalt cracks greater than 1” wide. Quotes shall be based on a removal depth of 3”. If full depth removal is necessary it will be quoted as an additional cost at the time of discovery and await approval prior to proceeding - Clean and sealcoat all asphalt in the areas included on the attached images - Restripe sealed areas with yellow paint to match existing - Repaint curbs to match existing District Office - Remove grass and debris and seal cracks ¼” to 1” with hot pour crack and joint sealant. Use backer rod on cracks deeper than ¾” deep to prevent sealant sagging - Remove and replace asphalt cracks greater than 1” wide. Quotes shall be based on a removal depth of 3”. If full depth removal is necessary it will be quoted as an additional cost at the time of discovery and await approval prior to proceeding - Restripe the entire lot with yellow paint to match existing Possible Alternate at Andover Middle - Mill and overlay the small parking area and drivelanes on the south end of the property. - See attached image