Project scope of work includes the following approximate quantities: 290 LF of Storm Sewer, 35 LF of Manholes & Catch Basins, 6 EA Castings, 800 LF of 4-Inch Perforated Pipe, 20 EA of F&I Chimney Seals, 60 EA of Adjust Utility, 4000 CY of Stripping Topsoil, 16700 CY of Common Excavation, 2350 SY of Geogrid, 22000 SY of Geotextile Fabric, 12800 CY of Granular Material for Base, 18500 SY of Concrete Pavement, 320 SY of Asphalt Pavement, 2650 SF of 8” Reinforced Driveway, 2000 LF of Pavement Marking, 24 EA of F&I Commercial Street Light, 4250 LF of 1.5” Conduit - #4 THWN, 300 LF of 2” Conduit, 3 EA of Rock Construction Exits, 12 EA of Trees, 15 Acres of Seeding, 6 Acres of Straw Mulch, 0.5 Acres of Hydromulch, 535 MGAL of Turf Watering, 4 EA of Hydrant Extensions, 3850 SY of Erosion Control Blanket, Erosion Control and Related Items.