The first restroom under this RFP will be installed in 2026 at McKay Park. The City will request any manufacture-supplied products that will be encased in concrete, i.e. drain inlets and templates, be delivered as soon as possible after order is placed, in advance of the restroom itself, so that they can be set by the General Contractor during the concrete installation on site. General Restroom Description: a. Size. The restroom shall be no larger than twelve (12) feet long and seven (7) feet wide at its longest dimensions, and no taller than nine (9) feet. b. Wall panels, doors and roof shall be 3/16” thick, heavy duty 304-grade stainless steel and powder-coated to resist vandalism and graffiti. c. Mechanical chase shall be incorporated into building design to house electrical and plumbing systems. d. Louvered panels shall be provided at top and bottom of structure to provide an open-air design that allows for ventilation and visibility. e. Building to be designed with a 110-volt AC hard wired electrical system. f. Control circuits shall be housed in a National Electrical Manufacturers Association (NEMA)-approved enclosure. g. Building shall include electric-powered recessed interior and exterior LED lights, with automatic lighting system utilizing photo-eye and motion-sensor...