1. Provide basic work zone traffic control according to the contract documents and as ordered by the Engineer. 2. Perform vertical clearance improvements through reconstruction in both the I-90 Eastbound and Westbound directions under the NY Route 33 overpass. 3. Replace pier protection at the NY Route 33 overpass. 4. Replace median drainage trunkline including drainage structures. 5. Replace existing temporary concrete median barrier with permanent concrete single slope barrier. 6. Replace 5 overhead span sign structures and replace 1 cantilever sign structure. 7. Mill 2” of asphalt and replace with new 2” of asphalt. 8. Replace existing guiderail with new guiderail at various locations. 9. Replace existing culvert end sections, clean inverts, and clean ditches of various small culverts. 10. Replace various ground mounted traffic signs. 11. Replace all roadway pavement striping. 12. Restore disturbed areas and clean-up as directed by the Engineer.