A. Description of Project: lead service line replacements with trenchless construction of water service pipe reconnected to the water main, including B-Box (shut-off valve). The project also includes the removal and replacement of sidewalk, hot mix asphalt, and concrete pavement. Landscaping restoration shall be limited to reseeding and reinstallation of any fence (removed to accommodate work), and restoration inside of the structure is limited to the work shown in the standard details on the contract drawings. Contractor is not responsible for repairs to drywall within the structure. Contractor is responsible for distribution of pitcher filters to residents immediately after service line replacement. B. Work Covered by Contract Documents: as described in the Drawings and Specifications.