Replace obsolete BAS controls with EcoStruxure graphic front-end (Schneider Preferred) Replace sensors, flow meters. Original valves and actuators. Mechanical Replacement of the 300 Tons Chiller VFD. Installation of upstream power conditioner/power quality units upstream of the chiller. Installation of Water Side economizer for the plant. Replace IT and Electrical Room RTU’s. Replace all maintenance-prone primary and secondary chilled and hot water pumps. Replace chemical controllers, pumps and probes, make up water meter and Blowdown water meter, make up water valve and actuators, Blowdown water valves and actuators. Replace refrigerant monitoring systems. Electrical All other electrical work necessary to complete the project.