A. Site / Civil 1. Scope of work is generally as shown on drawings and specifications, including, but not limited to, the following: a. Public street improvements and site entrance. b. Extension of domestic water service and fire water service to project site and tie-in to building systems. c. Extension of sanitary sewer service to project site and tie-in to building systems, including lift station(s). d. Extension of electrical service to project site and tie-in to building systems. e. Extension of tele/data service to project site and tie-in to building systems. f. On-site stormwater management facilities and infrastructure. g. Concrete curbs, concrete sidewalks, asphalt paving, and rubber play surfacing. h. Rough grading, final grading, plantings, seeding and sodding. i. Associated work. 2. Structural a. Footings and foundations. b. Concrete floor slabs c. Structural steel building frame, bar joists and steel deck. d. Miscellaneous metals and building components. e. Associated work. 3. Architectural a. Masonry exterior cavity wall assemblies and concrete block interior partitions. b. Steel stairs, steel ladders, steel/aluminum handrails, miscellaneous metals. c. Metal stud, rain screen exterior wall assemblies and metal stud and gypsum wall board interior wall assemblies. Bullet resistant wall panels. d. Rough carpentry, blocking, laminate clad casework, plastic panel casework, solid surface countertops and window sills.