Manhole cost per one (1) Catch Basin cost per one (1) CA-7 cost per ton Operator cost per hour. Submit all materials required for review and approval prior to ordering. Sawcut and remove existing 4” watermain and B-box to building at existing N. Cedar Road firetruck entrance per Civil Engineering Drawings. Sawcut and remove existing 4” exterior sanitary sewer from north side of property to the footprint of the existing building per Civil Engineering Drawings. Furnish and install new 6” x 12” tee, 6” valve vault, and 6” watermain from N. Cedar Road to the existing building apparatus bay per Civil Engineering Drawings. Watermain shutdown coordinated with New Lenox Public Works. Furnish and install seven (7) manholes and 12” storm piping for roof drains per Civil Engineering Drawings. Furnish and install two (2) new catch basins underneath asphalt drive west of existing building per Civil Engineering Drawings. Furnish and install new 12” Flared End Section on storm piping from the expansion per Civil Engineering Drawings. Furnish and install new inspection manhole over the existing 6” sanitary sewer piping north of the new expansion per Civil Engineering Drawings. Connect to existing catch basins and manholes as needed per Civil Engineering Drawings.