Contractor shall demo/remove existing HVAC split system to include line sets. Contractor shall install new hangers for air handlers as needed. Contractor shall install new condensing unit and new air handler The new split system shall be (1) 15-ton, 3 phase split unit with heat strips. All new line set shall be installed which consist of up to 150 ft. Existing duct work shall be reconnected with proper connections. Inspections shall be included in proposal. The new equipment shall be operated and tested after install to ensure proper CFM ratings and ensure freon pressures are in adequate operating ranges. Contractor shall provide any additional material and subcontracting work needed to complete the project. Contractor shall be liable for any damage caused during demo and install. Contractor shall verify all work during pre-bid to ensure no change orders arise. Contractor shall cleanup work area and work areas shall be free of any debris during & after construction. Contractor shall coordinate schedule with Owners (Cumberland County). Contractor shall communicate with owners on schedule, timelines, and provide oversite over project. Contractor shall schedule start up with owners.