The contractor shall verify existing conditions, dimensions, and UPS specifications to ensure code compliance and proper installation. Contractor shall verify all work during pre-bid to ensure no change orders arise. Contractor shall cleanup work area and work areas shall be free of any debris during & after construction. Contractor shall coordinate schedule with Owners (Cumberland County). Contractor shall communicate with owners on schedule, timelines, and provide oversite over project. The contractor shall coordinate, obtain all proper permits and inspections required. The contractor shall submit a written plan attached to bid to effectively limit the duration of interruption for existing UPS loads and provided a not to exceed time for load interruption during the installation process. The contractor shall demo and dispose of existing UPS including battery cabinet. The contractor shall provide all necessary labor and materials to install a new basis of design Schneider Electric Galaxy VS UPS Solution or a like unit that matches the manufacture’s specifications below: o Power rating- 60KVA/KW o System input- 480V/3PH (3wire+Ground) o System Output- 120/208V/3PH (4 Wire+Ground) o Battery back up capacity- Minimum 63 Minutes