GENERAL City of Omaha Responsibilities: • Wiring and un-wiring of motor. • Check motor direction before pump is coupled to the motor. • Isolate the pump before work is started. • Remove the existing skylight and provide a crane for removal of the pump and the motor out of the building. • Remove and install any instrumentation that goes with the pump and motor. • Electricity and air will be provided. Contractor Responsibilities: • Uncoupling of motor from pump. • Disconnecting all bolts required for removal of pump, including all bolts to remove pump from the motor. 2 • Rigging the pump and the motor to be removed by the City provided crane. • All tools and rigging required to remove pump and motor, as well as unrigging pump when placed on truck. • All safety equipment and procedures to complete the above tasks. • It is the contractor’s responsibility to follow Standard Specifications for Public Works Construction 2003 3rd Edition. II) SCOPE OF WORK 1) Furnish the following items new to OEM specifications: • Tension bearing • Intermediate bearing • Transition bearing • Suction bell bearing • Impeller wear ring • Coupling nuts • All gaskets and fasteners • All proper bearings • Provide all required fittings and hardware 2) Transportation to the rebuild facility and back to the City site for installation is the contractor’s responsibility