Mobilization (No Greater Than 5% of Total Bid) Demolition and Removal of Above Ground Structures, Including Requirements in Asbestos Report, Including Haul-Off and Disposal Excavation Below Foundations to 4' Below Grade, Including Haul-Off and Disposal Overall Site Excavation and Regrading, Including Tree/Brush Removal and Clearing, Including Select Earth Fill Material to Grades Shown on Plans, Complete in Place Remove and Dispose of Existing Pavement, Curb and Base (All Types and Depths), Includes all Saw-Cutting Required, Includes Haul-Off and Disposal Utility Disconnection, Including Removal Existing Pipe (All Sizes), Includes Haul-Off and Disposal SWPPP Measures per the Drawings, Including Inspection, Maintenance, Reporting, and Other Permits Requiring Coordination Chain Link Fence for Lift Station, Including Access Gates, Including Beige Privacy Slats, Complete in Place 6-Inch Reinforced Concrete Driveway, Including 6-Inch Cement Stabilized Sand and Curb Removal, Complete in Place 4-1/2-Inch Reinforced Concrete Sidewalk, Including 6- Inch Cement Stabilized Sand and Curb Removal, Complete in Place