The CM Consultant shall provide the OH-112 construction management services to: 1. Line existing 96-in. Force Main with carbon fiber reinforced plastic (CFRP); 2. Replace the 84-in. discharge header and 66-in. risers; 3. Replace the five (5) 60 MGD Main Sewage Pump (MSP), shafts, bearings, base, elbows, supports and appurtenances; 4. Install five (5) medium voltage (MV) Variable Frequency Drives (VFDs) and install new VFD Room; 5. Replace the four (4) primary side climber screens with primary side multi-rake screen; 6. Replace the four (4) secondary side climber screens with secondary side multi-rake screen (3/8” bar sizing); 7. Replace the forebay, screening influent, screening effluent, and primary settling tank splitter box slide gates; 8. Install dry well flood recovery pump; 9. Replace Venturi Meter; 10. Replace channel air blowers in new location...