MOBILIZATION 1.000 LS; BONDS AND INSURANCE 1.000 LS; RAILROAD INSURANCE AND FLAGGING L and C railroad 1.000 LS; REMOVAL & DISPOSAL OF EXISTING PAVEMENT 956.500 SY; REMOVAL & DISPOSAL OF EXISTING CURB 30.000 LF; REMOVAL OF EXIST. GUARDRAIL 512.000 LF; UNCLASSIFIED EXCAVATION 991.400 CY; BORROW EXCAVATION 483.000 CY; STATION GRADING 5.000 STA; MAINTENANCE STONE 187.500 TON; CEMENT MODIFIED RECYCLED BASE (8" UNIF)-CURING METHOD B 119,648.400 SY; PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE 3,016.000 TON; LIQUID ASPHALT BINDER PG64-22 1,305.499 TON; FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 180.000 SY; FULL DEPTH ASPH. PAV. PATCHING 10"UNIF 4,190.000 SY; MILLING EXISTING ASPHALT PAVEMENT 1.5" 6,968.000 SY; MILLING EXISTING ASPHALT PAVEMENT 1.75" 40,735.000 SY; MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 37,066.000 SY...