MOBILIZATION 1.000 LS BONDS AND INSURANCE 1.000 LS CONSTRUCTION STAKES, LINES & GRADES 1.000 EA RAILROAD INSURANCE AND FLAGGING CSX 1.000 LS REMOVAL OF EXIST. GUARDRAIL 490.000 LF UNCLASSIFIED EXCAVATION 530.000 CY BORROW EXCAVATION 2,404.000 CY EXCAVATION FOR SHOULDER PAVING 653.664 STA HAULING OF EXCAVATED SHOULDER MATERIAL 653.664 STA ADDITIONAL ROCK FOR FULL DEPTH RECLAMATION 1,245.000 TON MAINTENANCE STONE 54.550 TON CEMENT MODIFIED RECYCLED BASE (10" UNIF)-CURING METHOD B 74,625.000 SY PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE 2,615.000 TON HMA SHOULDER WIDENING COURSE 4,630.120 TON LIQUID ASPHALT BINDER PG64-22 1,314.337 TON ARAMID FIBER 2,465.000 LB FULL DEPTH ASPH. PAV. PATCHING 4" UNIF. 5,305.000 SY FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 150.000 SY MILLING EXISTING ASPHALT PAVEMENT 2.0" 1,690.000 SY MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 4,400.000 SY ASPHALT SURFACE COURSE TYPE B 1,048.426 TON ASPHALT SURFACE COURSE TYPE C 14,365.681 TON ASPHALT SURFACE COURSE TYPE D 1,275.000 TON DRIVEWAY PAVING-SURFACE TYPE D 573.125 TON TRAFFIC CONTROL 1.000 LS PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 872.000 SF 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 940.000 LF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 309,950.000 LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 845.000 LF WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 4.000 EA RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 4.000 EA 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 21,520.000 LF