MOBILIZATION 1.000 LS; BONDS AND INSURANCE 1.000 LS; CONSTRUCTION STAKES, LINES & GRADES 2.000 EA; RAILROAD INSURANCE AND FLAGGING Carolina Piedmont Division 1.000 LS; RAILROAD INSURANCE AND FLAGGING CSX 1.000 LS; REMOVAL & DISPOSAL OF EXISTING PAVEMENT 300.000 SY; REMOVAL OF EXIST. GUARDRAIL 250.000 LF; UNCLASSIFIED EXCAVATION 255.000 CY; BORROW EXCAVATION 5,617.000 CY; EXCAVATION FOR SHOULDER PAVING 1,050.000 STA; HAULING OF EXCAVATED SHOULDER MATERIAL 1,050.000 STA; MAINTENANCE STONE 588.400 TON; CEMENT MODIFIED RECYCLED BASE (10" UNIF)-CURING METHOD B 33,625.000 SY; PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE 1,094.000 TON; HMA SHOULDER WIDENING COURSE 4,803.215 TON; LIQUID ASPHALT BINDER PG64-22 1,812.707 TON; LIQUID ASPHALT BINDER PG76-22 43.010 TON; FULL DEPTH ASPH. PAV. PATCHING 4" UNIF. 6,975.000 SY; FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 11,560.000 SY; FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 20,315.000 SY; FULL DEPTH ASPH. PAV. PATCHING 10"UNIF 11,610.000 SY; FULL DEPTH ASPH. PAV. PATCHING 12"UNIF 125.000 SY...