MOBILIZATION 1.000 LS; BONDS AND INSURANCE 1.000 LS; RAILROAD INSURANCE AND FLAGGING CSX 1.000 LS; REMOVAL OF EXIST. GUARDRAIL 8,450.000 LF; BORROW EXCAVATION 2,108.000 CY; EXCAVATION FOR SHOULDER PAVING 947.232 STA; HAULING OF EXCAVATED SHOULDER MATERIAL 947.232 STA; MAINTENANCE STONE 43.500 TON; HMA SHOULDER WIDENING COURSE 5,661.627 TON; LIQUID ASPHALT BINDER PG64-22 1,448.076 TON; ARAMID FIBER 3,500.000 LB; FULL DEPTH ASPH. PAV. PATCHING 4" UNIF. 2,690.000 SY; FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 200.000 SY; FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 1,460.000 SY; MILLING EXISTING ASPHALT PAVEMENT 1.5" 4,770.000 SY; MILLING EXISTING ASPHALT PAVEMENT 1.75" 84,630.000 SY; MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 6,100.000 SY; ASPHALT SURFACE COURSE TYPE B 8,320.020 TON; ASPHALT SURFACE COURSE TYPE C 8,372.100 TON; ASPHALT SURFACE COURSE TYPE D 2,374.700 TON; DRIVEWAY PAVING-SURFACE TYPE D 393.750 TON; TRAFFIC CONTROL 1.000 LS...