ROADWAY ITEMS: Mobilization 1.000 LS Clearing and Grubbing 1.000 LS Removal of Bridge At Sta. 71+97 1.000 UN Removal of Pavement (All Thicknesses) 1,600.00 SY Unclassified Excavation (FM) 1,036.00 CY Borrow Excavation (F.M.E.) (Contractor Furnished) (Class 9) 256.000 CY Channel Excavation (FM) 292.000 CY Geotextile Fabric Stabilization (Type V, Non-Woven) (AOS<0.43) 2,552.00 SY Crushed Stone (Size 3/4" & Down) (FM) 530.000 CY Class "B" Structural Concrete, Minor Structures 0.166 CY 29" x 18" Reinforced Concrete Arch Pipe, Class A-III 56.000 LF 29" x 18" Reinforced Concrete Arch Pipe, End Section 2.000 EA Right-of-Way Markers (Type II) 13.000 EA Maintenance of Traffic 1.000 LS Additional Construction Signs 0.000 SF Reflectorized Traffic Object Marker (Encapsulated Lens) (Type 3) 4.000 EA EROSION CONTROL ITEMS: Agricultural Limestone 0.630 TON Commercial Fertilizer (13-13-13) 0.630 TON Seeding 1.250 AC Vegetative Materials for Mulch 3.750 TON Solid Sodding 100.000 SY Temporary Silt Fence (Type I or II) (AOS 0.15-0.84) 305.000 LF Wattles, 20" 200.000 LF Loose Riprap, 300 Lb. 220.000 TON Geotextile under Riprap, Type V, AOS<0.43 (Non-Woven) 318.000 SY BRIDGE ITEMS: Test Pile 2.000 EA Conventional Static Pile Load Test 0.000 EA 12” Steel Piling 640.000 LF 18” Preformed Pile Hole 480.000 LF Bridge Concrete, Class A 97.580 CY 80' Prestressed Concrete Beam Type III 398.750 LF Reinforcement 21,463.00 LB Concrete Railing 160.000 LF Loose Riprap, 300 Lb. 144.000 TON Geotextile under Riprap, Type V, AOS<0.43 (Non-Woven) 128.000 SY