a. On all three barns, inspect the wooden framing system and replace/sister any deteriorated wood as directed by the DNR Project Manager using Unit Price #1, Unit Price #2, Unit Price #3, and Unit Price #4. b. Remove the partially collapsed end bay on Farm Equipment Barn 3, approximately 20’ x 30’; backfill area with topsoil to existing grade, seed, and mulch. c. Remove and replace siding, approximately 4,200 SF on Barn 1 (wooden siding), 3,800 SF on Barn 2 (wooden siding), and 2,355 SF on Farm Equipment Barn 3 (metal siding). See the attached Drawings for the locations and photos of the barns. d. On Barn 2, replace the damaged corrugated vertical panel at the southeast corner of the side addition, approximately 18” wide by 12’ high. e. On the east side of Barn 1, fill-in the burrow hole at the bottom of the wall with soil and compact.