Water Improvements: Approximately 7,800 LF of 8” PVC water line, 3,500 LF of 12” PVC Water line, 8” & 12” gate valves, fire hydrants, water services, and related items as depicted for the 185-lot development. Sewer Improvements: Approximately 40 LF of 6” PVC sewer line, 7,600 LF of 8” sewer line, 340 LF of 10” PVC sewer line, 4” sanitary sewer services to 185 lots, 4’-6’ manholes, trench water stops and related items as depicted for the 185-lot development. Drainage Improvements: 18-60” RCP, 36” CMP, 7’x3’ SBC, 7’x4’ SBC, 8’x4’ SBC, 10’x4’ SBC drain systems, curb inlets, headwalls, safety end treatments, junction boxes, stone riprap, grade-to-drain channels and other related items as depicted for the 185-lot development.