1. PROCESS EQUIPMENT DIMENSIONS, LOCATIONS AND PIPING SYSTEM LAYOUTS ARE BASED ON EQUIPMENT SELECTED AND SPECIFIED BY THE DESIGN ENGINEER, PER SPECIFICATION SECTION 467621 FOR BELT FILTER PRESS. IF THE CONTRACTOR PROPOSES TO FURNISH EQUIPMENT THAT REQUIRES AN ARRANGEMENT OR SPACE DIFFERING FROM THAT INDICATED ON THE DRAWINGS OR SPECIFIED, THE CONTRACTOR SHALL PREPARE AND SUBMIT TO THE ENGINEER AND OWNER FOR APPROVAL DETAILED STRUCTURAL, MECHANICAL, PLUMBING, INSTRUMENTATION, AND ELECTRICAL DRAWINGS AND EQUIPMENT LISTS SHOWING ALL NECESSARY CHANGES AND EMBODYING ALL FEATURES OF THE EQUIPMENT AT NO ADDITIONAL COST TO THE OWNER. THIS INFORMATION SHALL INCLUDE, BUT NOT BE LIMITED TO, PROCESS SYSTEM PROPOSED, PLANS, SECTIONS, DETAILS AND SCHEMATICS OF ALL APPURTENANCES REQUIRED. 2. SIZES OF EQUIPMENT FOUNDATIONS AND EQUIPMENT PADS INDICATED ON THE DRAWINGS ARE APPROXIMATE, EXACT DIMENSIONS SHALL BE DETERMINED BY THE CONTRACTOR FOR THE EQUIPMENT FURNISHED. ALL FLOOR MOUNTED EQUIPMENT SHALL BE SET ON CONCRETE PADS CONFORMING TO DETAILS SHOWN ON THE STRUCTURAL DRAWINGS. 3. CONTRACTOR SHALL COORDINATE EXACT LOCATION AND LENGTHS REQUIRED FOR ALL PIPING CONNECTIONS WITH THE EQUIPMENT SUPPLIERS, AND OWNER. 4, WATER SUPPLY CONNECTIONS TO PROCESS EQUIPMENT AND PROCESS PIPES ARE SHOWN ON THE MECHANICAL DRAWINGS. DETAILS OF CONTROL VALVE STATIONS, MAKE-UP WATER CONNECTIONS, FLUSHING CONNECTIONS ETC. ARE SHOWN ON THE MECHANICAL DRAWINGS. IF APPLICABLE, LIMITS OF WORK ARE SHOWN ON THE MECHANICAL, INSTRUMENTATION, ELECTRICAL AND PLUMBING DRAWINGS. 5. DIELECTRIC COUPLINGS, FLANGES OR UNIONS SHALL BE INSTALLED AT ALL CONNECTIONS OF DISSIMILAR METALS AND AS INDICATED ON DRAWINGS 6. MECHANICAL PLANS AND SECTIONS DO NOT SHOW ALL VALVES, GAUGES, SWITCHES, OPERATORS, DRAINS, VENTS, ETC. REQUIRED FOR THE COMPLETE SYSTEM. CERTAIN SMALL DIAMETER PROCESS PIPING RUNS MAY NOT BE SHOWN IN THEIR ENTIRETY, GENERALLY, SMALL PIPING IS SHOWN DIAGRAMMATICALLY IN THE INSTRUMENTATION DRAWINGS. SHOULD A POTENTIAL ROUTING INTERFERENCE BE DISCOVERED, NOTIFY ENGINEER AND OWNER. THE CONTRACTOR SHALL FURNISH, INSTALL AND TEST ALL PIPING SYSTEMS AS INDICATED ON THE INSTRUMENTATION DRAWINGS AND SPECIFICATIONS TO PROVIDE THE COMPLETE SYSTEM. 7. UNLESS OTHERWISE SHOWN ON THE MECHANICAL DRAWINGS, ALL FLOORSLAB, WALL AND TANK PENETRATIONS SHALL BE AS SHOWN ON THE PENETRATION DETAILS INCLUDED IN THE MECHANICAL CONSTRUCTION DETAILS. ABOVE GROUND EXTERIOR WALL AND ROOF PENETRATIONS SHALL BE AS SHOWN ON THE ARCHITECTURAL DRAWINGS. B. STANDARD PIPE SUPPORT DETAILS ARE PROVIDED IN THE MECHANICAL DETAIL DRAWINGS, SUPPORT PIPES IN ACCORDANCE WITH SPECIFICATION SECTION 400507, "HANGERS AND SUPPORTS FOR PROCESS PIPING. 9. ALL EQUIPMENT BASES AND PIPING HAVING DRAIN OUTLETS SHALL BE PIPED TO THE NEAREST OPEN END DRAIN (OED) OR TRENCH DRAIN USING SCHEDULE 80 PVC PIPE OF APPROPRIATE DIAMETER AS INDICATED ON THE DRAWINGS AND AS DIRECTED BY THE ENGINEER. 10. PIPING SHALL BE INSTALLED SUCH THAT ANY PIPE, LAYER OF PIPING OR EQUIPMENT CAN BE REMOVED WITHOUT DISTURBING REMAINING PIPES AND SUPPORTS. 11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR TAGGING ALL PROCESS PIPING VALVES AND EQUIPMENT AND RECORDING AS-BUILT LOCATIONS FOR THE SAME. PROCESS IDENTIFICATION SYSTEM SHALL BE AS DETAILED IN THE SPECIFICATIONS. 12. PORTIONS OF NON-PROCESS PIPING (PLUMBING) ARE NOT SHOWN FOR CLARITY AND FOR COORDINATION BETWEEN DISCIPLINES. REFER TO APPROPRIATE DRAWINGS AND SPECIFICATIONS. 13. DELEGATED SUBMITTAL ITEMS SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW DURING THE CONSTRUCTION PHASE OF THE PROJECT. REFER TO SPECIFICATION SECTION 467621 FOR DELEGATED DESIGN. 14. DELEGATED SUBMITTAL ITEMS SHALL BE SIGNED AND SEALED BY A REGISTERED ENGINEER IN THE STATE OF GEORGIA. 15. DELEGATED SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THE ENGINEER OF RECORD HAS REVIEWED THE SUBMITTAL DOCUMENTS AND INDICATED THAT THEY HAVE BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE WITH THE INTENT OF THE DESIGN. 16. THE LAYOUT DRAWINGS SHOWN IN THIS SET ARE BASED ON THE RECORD DRAWINGS PRODUCED BY PARSONS WATER AND INFRASTRUCTURE, INC. DATED AUGUST 25, 2016.