The Project includes constructing the Work broadly described below, in accordance with the Contract Documents, with all related appurtenances. Work shown on the Drawings, or indicated in the Specifications, or indicated elsewhere in the Contract Documents is part of the Work, regardless of whether indicated below. The Work includes, but is not limited to, the following: 1. Silver Lake Intake Pump Station: a. Provide a Floating Intake Pump Station and Submersible Pump System including flexible discharge hose, pipe floats, anchor blocks and anchor rope, associated electrical and instrumentation systems, and all components and appurtenances required for a complete and operational system. b. Install permanent discharge piping on the existing steel bridge/walkway and complete a tapped connection into the existing steel raw water main. c. Electrical improvements to the Silver Lake Intake Pump Station. d. Replacement of two (2) existing 250 HP centrifugal pump motors, including all required appurtenances. 2. Ramsay Pump Station: a. Electrical and instrumentation improvements to the Ramsay Pump Station. b. Replacement of four (4) existing 350 HP centrifugal pump motors, and inspection and rehabilitation of the existing pumps, including the installation of a new automated vacuum priming system, including all required valves, piping, and appurtenances. c. Replacement of existing motor controls for the two (2) 125 HP centrifugal pumps at the TFID Pump Station. d. Replacement of the sectional overhead door and all louvers