1 Demo/Remove existing concrete and caulk joints from selected areas (approx. 9,700 SF concrete and 2,200 LF of caulk) LS 1 $ $ 2 Prepare base, form, provide and placement of cast in place concrete CY 162 $ $ 3 Remove excess subbase and compact proper base for 6 inch thick concrete area CY 20 $ $ 4 Caulk using Tremco Dymonic® 100 or approved equal and tool out all perimeter, expansion and control joints of newly installed concrete LF 2,200 $ $ 5 Remove concrete in Area C, excavate Area A-C footings and form for cast in place concrete LS 1 $ $ 6 Caulk and tool out all perimeter of barrier slabs and individual bollards LF 280 $ $ 7A M30 shallow mount double post array for post and beam assemblies EA 6 $ $ 7B M30 beam approx. 22 feet long for post and beam assemblies EA 4 $ $ 7C M30 single approx. 15 feet 6 inch long for post and beam assemblies EA 1 $ $ 7D M30 single standard mount bollard EA 3 $ $