State of Hawaii, DLNR, Division of Forestry & Wildlife-Maui District is requesting quotes for Koolau FR and Hana FR Helicopter Landing Zone Replacement Project. Specifications include, but are not limited to: - Vendor is responsible for dismantling and removal of existing deck materials and the construction of new deck in same location - Vendor is responsible for all logistical arrangements to complete project - Materials list for camping deck 20’ x 20’ referenced below - Deck type: Plastic decking w/ square tubing frame on round pipe piers; Deck; 40 pcs plastic decking 20’ x 1” x 5.5”; Furring Strips – lag bolted to side of joists; Plastic deck board ripped to 2” x 10’ [22 pcs]; Frame; 9 Piers 2 3/8” pipe – cut to length on site; Est. 7’ – 10’ lengths depending slope and depth to solid bottom; Place on 8’ spacing [16’ square] to make deck with 2’ overhang on all sides; 9 T–braces 2” x 9” pipe welded to 2.25” sq tubing x 6”; 3 Girders 6 pieces 2” x 10’sq tub 12ga [buttjoint;slidesthroughT-bracegives 20’] Overhangs post 2’ on each side; 11 Joists 22 pieces 2” x 10’sq tub 14 ga [buttjointwith splintinside gives 20’] 24” OC - overhangs girder 2’ on each side; 11 Splint 1-3/4 sq tub 12 ga x 12”; 8 Angle brace Pier to Joist/Girder Braces in both directions at each corner = 8 braces; 6’ flange sign post - drill extra 5/16” hole 1” from bottom end;