The work to be performed under this contract includes the milling and resurfacing Section 6 of Clinton Road station 0 +00 to 65+90. Contract work also includes drainage inlet reconstruction, driveway aprons, roadway edge base repairs, traffic lines and markings, and installation of regulatory and warning signs and other incidental work. Principal items of work in the project include: · 330 C.Y. Excavation, Unclassified · 26,900 S.Y. HMA Milling, 3” or Less · 2,500 TONS Hot Mix Asphalt 12.5M64 Surface Course, 2” Thick · 1,900 TONS Hot Mix Asphalt 9.5M64 Intermediate Course, Variable Thickness · 1,650 TONS Hot Mix Asphalt 19M64 Base Course, 4” Thick · 13,700 L.F. Traffic Stripes, 4” · 13,700 L.F. Traffic Stripes, 6”