Scope of Work: The work will consist of Standby Power – FEMA Grant 2026 Implementation, including unloading and installation of one (1) Owner supplied “Fixed” 125 kW generator, one (1) Owner Supplied “Fixed” 80 kW generator, one (1) Owner Supplied “Fixed” 45 kW generator, one (1) Owner supplied 200 Amp Automatic Transfer Switch, one (1) Owner supplied 150 Amp Automatic Transfer Switch, one (1) Owner Supplied 100 Amp Automatic Transfer Switch, Contractor supplied PVC conduit, Contractor supplied Rigid Conduit (RMC), Contractor supplied electrical wiring, any concrete incasement if required at the Moss Spring location., connections , conduits, wiring, switches, panels, receptacles and necessary mounting materials.