42-inch HDPE Pipeline. Furnishing and installation of roughly 7,844 feet of 42-inch HDPE pipeline from approximately 12124 S on Bacchus Highway to 7028 West and 11800 South. This part of the project includes the installation of valves, tees, fittings, connection to existing water system, connection to future water tank, commission of transmission line, and miscellaneous appurtenances to the pipelines. Coordination with another agency’s contractor will be required. Meter Vault. Construction of a JVWCD meter vault, 30” welded steel pipeline connecting to JVWCD aqueduct and new 42-inch HDPE Pipeline, combination air valve boxes, tank drain outlet box, asphalt patch restoration in the South Jordan City right-of-way, and all appurtenances necessary for a fully operational meter vault. This part of the project includes electrical connections and work associated with the valve vault and telemetry wiring for a RTU. Project also includes sampling, testing, and handling of potential contaminated soils in accordance with a soil management work plan approved by the Utah Division of Environmental Response and Remediation.