1. Approx ~ 160 ft x 40 ft (Contractor responsible for exact measurement). Install 6” thick of concrete at 3000 psi. 2. Approx ~ 90 ft x 60 ft (Contractor responsible for exact measurement). Install 4” thick of concrete at 3000 psi. 3. Remove damaged concrete (see page 4). 4. Contractor is responsible for disposing of all concrete removed. 5. Contractor to ensure base material is adequate for new install. 6. Safety fence to be installed by contractor when work begins and removed by contractor when work is complete. Exact locations of fence will be determined by the contractor, district & school. 7. Backfill around concrete as needed. 8. Any damage done to curb paint will be the responsibility of the contractor to repair. 9. Mandatory Site visit: see page 1 for details. 10. Before leaving each day, site must be cleaned up and trash / debris disposed of off site. 11. No tobacco products of any kind on school grounds 24/7/365 12. Must submit invoice within 30 days of work being completed