(1) sign truck package consisting of a sign body, crane, hydraulic components, catwalk, power inverter, and other accessories. The STATE intends to have one (1) complete unit built. Prior to the contractor starting any work on the sign truck package, the STATE will review all drawings and plans for approval. The STATE will deliver the existing truck chassis to the contractor. The contractor will remove the crane components for the repair and reinstallation (as requested in Section 3 “Crane” of Attachment 5 “specifications SSP-95-5100-8”) on the new body, provided by the contractor. The body and components requested in Attachment 5 “Specification SSP-95-5100-8” will be installed by the contractor on a new chassis, delivered by the STATE to the contractor. The awarded contractor will be responsible for delivery to the district location once the building of the unit is completed and passes inspection.