• Rehabilitate Taxiway B (50' wide) (PCI values ranging from 36 to 42), mill, crack fill, overlay taxiway and lead-to's, pavement marking, seeding, mulching Est. cost $1.86M • Rehabilitate Taxiway A (50' wide) (PCI values ranging from 36 to 45), mill, crack fill, overlay taxiway and connector taxiway to Rwy 27, pavement marking, seeding, mulching. Est. cost $1.03M • Rehabilitate Taxiway B Apron, Mill and Overlay Taxiway B Aprons (PCI value of 23), crack fill, pavement markings, seeding, mulching. Est cost $960,000 • Rehabilitate T-hangar pavements-Phase 3 - PCIs ranging from 34 to 56 - mill, crack fill, overlay pavements, pavement marking; Est. cost: $525,000 • Rehabilitate T-hangar pavements-Phase 3 - PCIs ranging from 34 to 56 - mill, crack fill, overlay pavements, pavement marking; Est. cost: $520,000 • Rehabilitate Runway Circuit Lighting and Signage IAW Master Signage Plan- remove current signage, rewire, remove/replace concrete footings, install new signs; Est. cost $1.5M • Rehabilitate North Apron (150' x 450') (PCI values ranging from TH/3 25 to R/9 50), mill crack fill, overlay, pavement marking, seeding, mulching. Est. cost $875,000 • Reimbursement for Purchase of SRE Building-Phases 1-4 - Reimbursement for purchase of Frontier Building to serve as SRE building; IDOA determined 65% of Building would be eligible for AIP Funding in multi-years.; Est. cost: $600,000 • Replace Perimeter Fencing-Phases 2-4 - Replace existing 4' perimeter fence w/10' Class E, chain link fence as rec.by Wildlife Study; remove existing, install new footings, bury deterrent cloth, install fence; Est. cost: $3.75M • Reconstruct South Apron for Large Aircraft Parking, Rehabilitate North Apron (150' x 450') (PCI values ranging from TH/3 25 to R/9 50), remove asphalt, replace with concrete, seeding, mulching, pavement marking. Est. cost $1.5M • Acquire acreage for expansion-47ac/Winter, 25ac/Faivre, 32ac/Larson; Est. cost: $4,527,000 • Airport Utility Relocation-Phases I & II - Phase I - Develop preliminary plan sheet showing location of all existing utilities on airport and preliminary layouts of needed utility relocations to accommodate future airport developments to west and north as the airport acquires additional land; Phase II Relocation of existing utilities on Airport that were shown in Phase I to conflict with future development- Est. cost: $830,000Enlarge 1st detention basin & const. 2nd basin-Phase II - Enlarge 1st detention basin, construction of 2nd detention basin in frontal area. Both basins will flow to existing basin along Loves Rd. Est. cost: $1.9M • Relocate a portion of Pleasant St - Relocate a portion (3,000' x 24') of Pleasant St to develop the East Frontal Area; Est. cost: $730,000