Eastern Oregon 2024-2027 ADA Curb Ramps, Phase 2 Project on the Pendleton and Pendleton-John Day Highways (Rt. No. US30, Hwy028, OR37) in Pendleton. FAP No. SA00(830). ($ 2,000,000 - $ 5,000,000). Req. approx. 2,950 ft2 temp sign; 64 hr flag; 64 hr flag sta light; 2,356 ft2 bar rem; 546 ft PCD; 6 ea temp curb ramp; 110 ea inlet protect; 1 ea decomm underg tank; 1,348 ton contam soil disp; 670 gal contam groundw rem; 9 ea soil test; const surv work; 6,743 yd2 rem surf curb ramp; 9,652 ft pvmt sawcut; 1,500 ft vid insp; 732 ft pipe; 12 ft trench drain; 12 ea manhole; 46 ea inlet; 41 ea adj struct; 41 ea conn to exist struct; 12 ea manhole over exist sewer; 1,330 yd2 CPPR; 2,434 ton aggr base; 359 ton comm ACP; 5,482 ft conc curb; 97,253 ft2 conc struct; 1,787 ft2 trunc dome; 2 ea conc wheel stop; 62 ft pvmt marking paint; 2,418 ft2 pvmt bar; 2 ea crosswalk closure; 4,018 lb sign supp; 856 ft2 sign; rem electrical sys; refurb/reinstall exist illum sys; traff sig mod; 3 yd3 topsoil; 83 yd2 sod; 16 yd3 bark mulch; 31 yd3 rock mulch; 40 ft rem/rebuild fence; 26 ft metal handrail; 1 ea reconn water service. Completion Time: October 31, 2026. Classes of Work: A) Earthwork and Drainage, or B) Miscellaneous Highway Appurtenances. This project contains fuel escalation clause