Scheduled Tasks The scheduled tasks should be designed to provide continuing maintenance on the equipment listed below. The tasks should be scheduled to provide for the long-term care of the equipment listed. Each service visit should be scheduled and prepared by the Contractors dispatch system. The Contractor will be responsible for contacting the facility and scheduling visits. TRANE ROTARY SCREW AIR-COOLED LIQUID CHILLER Model# RTAC3004UMONUAFNL1TY1CDNRAOEA10NNOEXN Serial# U06F07511 CARRIER AIR-COOLED LIQUID CHILLER Model# 30RAP0256JA07F10 Serial# 3014Q51339 CARRIER AIR-COOLED LIQUID CHILLER Model# 30RAP0256JA07F10 Serial# 3014Q51354 Maintenance Maintenance shall be performed to manufacturer's recommendations and according to this contract Schedules Quarterly Inspection Inspect equipment thoroughly for signs of refrigerant leaks Perform meg test on compressors Check and tighten electrical connections and terminals Check condition of mechanical components Inspect fans, shafts and bearings for wear and alignment Lubricate motors and bearings as needed Check crankcase heaters for proper operation Check contacts for wear, pitting and/or erosion Inspect water strainers and clean as needed Start chiller and check operations Check unit controllers and other controls operate properly Verify proper voltage and amperage for all motors Verify proper operation of circulator pumps Check all safety and monitoring controls for proper operation Check for proper water flow through heat exchanger Check system charge, fluid temperatures, and approach temps