City of Fairhope drainage improvement project includes the removal and replacement of Pecan Streets outfall stormwater pipe network. The project will include 416 LF of 66” RCP, associated drainage structures, pavement removal/replacement, and the installation of 840 VSF of timber bulkhead. All work will be coordinated with the separate beach-front restoration project. REMOVE AND RESET BENCH (250A) REMOVING CONCRETE SIDEWALK (206C) REMOVING ASPHALT PAVEMENT (206C) REMOVING PIPE (2060) REMOVING BULKHEAD (2060) REMOVING JUNCTION BOXES {206E) UNCLASSIFIED EXCAVATION (210A) BORROW EXCAVATION (SELECT BACKFILL SAND) (2100) FOUNDATION BACKFILL (COMMERCIAL) (214B) CRUSHED AGGREGATE BASE COURSE, TYPE 8, PLANT MIXED, 6" COMPACTED THICKNESS (3058) SUPERPAVE BITUMINOUS CONCRETE WEARING SURFACE LAYER, PATCHING, 3/4" MAX AGGREGATE SIZE MIX, ESAL RANGE C/D (424A} 12" STORM SEWER PIPE (CLASS 3 R.C.) (533A) 24" STORM SEWER PIPE (CLASS 3 R.C.) (533A)