1. Successful Vendor will grade, pour and finish a concrete slab at Whaleyville Recycle Center. 2. The Successful Vendor will need to excavate out approximately 12” of dirt under existing stone. a. This will allow 4” of stone to be put back in the cut, and the top of the 8” slab to be about 1” above the surrounding elevation. 3. Successful Vendor will be responsible for grading around the slab, after forms are stripped. 4. The slab is 61.5’ X 40’ X 8” thick. 5. 10pcs 6” pipe bollards 7’ long (Purchased and installation by contractor per drawings) 6. 1 rebar mat #5 bar 12” on center (Purchase and installation by contractor per drawings) 7. Concrete will have compressive strength of 4000 PSI in 28 days. 8. Slab will have one expansion joint 61.5’ long. Expansion joint will be the total width of the slab, 20’ from the front edge of the slab. 9. The slab will have two 40’ control joints saw cut after the slab is poured. The saw cuts will be 20.5’ part from front to back, which will give us 6 equal pieces 20.5’ X 20’. 10. Contractor shall take test cylinders and perform breaks at 7-Days, 14-Days and at 28- Days.