The following is a general description of the work to be done under this Contract. This list is intended to give the Contractor a general description of the work involved in this Contract and is not a complete listing of all work to be done. All work shall be done in accordance with the Contract Documents even though not specifically mentioned in this list. 1. Setup detour and Work Zone Traffic Control Plan as required for bridge replacement. 2. Install temporary erosion and sediment control devices and perform clearing and grubbing operations as directed by Engineer. . 3. Remove existing structure to the limits shown on the plans. 4. Construct new bridge structure, including new vertical road alignment, drainage, and appurtenances. 5. Install and tie in new guiderail and pavement markings. 6. Restore disturbed areas and remove temporary erosion and sediment control devices as directed by Engineer upon stabilization of all disturbed areas. 7. Clean up as directed by the Engineer.