• Demolition of the single-family home at 89 Acadia Avenue in its entirety • Removal of the abandoned vehicles (title whereabouts unknown) • Removal of foundation walls, filling, and backfilling of the foundation to grade • Bid pricing must include the cost of a City of Lewiston Demolition Permit A. Demolition of the aforesaid structures located upon the City of Lewiston’s land; Bid pricing must include the cost of the City of Lewiston Demolition Permit. B. Removal of foundation debris, demolition of foundation walls, and filling foundation hole; Bid price is to include an estimated 50 yards of fill needed. C. Securing all demolition permits from the State of Maine, or the City of Lewiston and paying for any fees required with respect to such permit; D. Removal of all debris from the site, including building and yard, including the abandoned automobiles. E. Disposition of any and all of the demolition debris other than (I) that sold by Contractor, or otherwise recovered by Contractor as salvage, either on its own behalf or on behalf of the City, in accordance with the laws of the United States and the State of Maine and ordinances of the City of Lewiston; provided, nevertheless, that Contractor is authorized to sell any salvageable components of the structures for its own account, as set forth below. Within thirty (30) days after completion of Contractor’s services, Contractor will provide the City with copies of any documents evidencing the ultimate disposition of all demolition debris, except for such as has been sold for salvage; F. The Contractor will not be responsible for tipping fees; however, all demolition materials not salvaged must be conveyed, by the contractor, to the ReSource construction and demolition processing facility for disposal, during their normal business hours. The ReSource facility is located at 38 Alfred Plourde Pkwy., Lewiston. No unlabeled liquid containers or any hazard waste materials are to be brought to ReSource. G. The Contractor shall identify any fill sites to be used prior to contract signing; H. Disconnection and capping of any water or sewer service(s) currently connected within the project; I. Foundation walls shall be removed completely unless authorized by the Deputy Director of Budget and Purchasing. Concrete floor shall be broken up, removed and cellar hole filled as directed by Deputy Director of Budget and Purchasing as part of the base bid. Inspection of the site(s) prior to filling must be coordinated with the Deputy Director of Budget and Purchasing.