Vendor shall demolish existing restroom facility partitions and install new partitions. Vendor shall utilize high-density polyethylene panels (HDPE) partitions and urinal screens panel material, not less than one (1) inch (25mm) thick, seamless, with eased edges, and with homogenous color and pattern throughout thickness of material with stainless steel stirrup brackets, stainless steel door hardware, continuous piano hinges, continuous stainless steel brackets, stainless steel pilaster shoes, and full-height continuous brackets. 1.4.2. Vendor shall remove existing exhaust fan system and install new exhaust fan system. 1.4.3. Vendor shall visually inspect the interior of the wall behind urinals and complete repair work as required and/or deemed necessary. 1.4.4. Vendor shall remove existing 2x2 floor tiling and install new 2x2 floor tiling system in kind with kickplates. 1.4.5. Vendor shall repaint existing walls and ceilings. 1.4.6. Vendor shall remove existing paper towel dispenser and install new air drying equipment, incorporating Excel Dryers XLERATOR model #XL-BW-ECO...