The project is a full replacement of the marina. Each dock, gangway, landside stairs/abutments, and associated utilities are to be demolished. The existing stiff arms and their foundations will remain. The stiff arms will be sanded, painted, and attached to the new marina. The western portion of the cove will be dredged to provide adequate depth for Docks C, D, E, and F per the design drawings. Docks G and H are to be relocated and reassembled for use as temporary dock moorage during construction. The temporary moorage will provide 22 slips that are large enough to accommodate the largest houseboats currently occupying the existing marina. Electric will be provided for the temporary dock. The temporary dock is not a recreation dock. Houseboat owners will move their boats to the temporary dock, where they will remain throughout construction. Construction should be staged in a manner that permits 44 house boats to remain in the water with shore power. 22 houseboats will be moved to the temporary dock by the houseboat owners. The other 22 should be able to remain at the marina while other demolition, dredging, and construction occur.