Contractor(s) shall provide inspections and testing of fire extinguishers, pump, hydrant and sprinkler systems, and FM 200 systems as described herein and is responsible for all labor, material, tools, equipment, transportation and mileage costs necessary to complete all inspections and testing described in this bid document. Equipment: Fire Sprinkler and Pump Systems Fire Extinguishers Fire Hydrants FM 200 Fire Suppression System Required work shall meet preventative maintenance and inspection service standards of: Fire Sprinkler Systems, including pumps and hydrants in order to comply with NFPA 25 and The Joint Commission. 29 CFR 1910.157 and NFPA 10 requirements shall be met for Portable Fire Extinguishers and testing. NFPA 1, NFPA 25 & NFPA 291 requirements shall be met for Fire Hydrants. NFPA 2001 requirements for regular maintenance and testing for FM 200 systems. The contractor shall provide sprinkler testing and inspection for the following buildings: Four (4) Quarterly Automatic Fire Sprinkler Tests: Bldg B, I, H, F, E, L,