1.1.1 The work covered by this Section includes the furnishing of all material and equipment and the performing of all labor to complete the mechanical dredging and disposal of the dredged material as herein specified or directed by the City of Hampton (“Owner”). Dredging activities shall be in accordance with the most updated plan set named, “Gosnolds Hope Park Extension Dredging” (“Contract Drawings”). Hydraulic dredging is not permitted. 1.1.2 This work shall include, but is not limited to: a. Mechanical dredging of soil, organics and minor debris to the lines and grades indicated on the Contract Drawings. b. Transportation and disposal of dredged materials at the Contractor-specified disposal site. c. Removal, separation, and disposal in an approved off-site location of non-organic and organic woody debris encountered during dredging operations. d. Adhering to all requirements of approved disposal sites. 1.1.3 The materials to be removed under this Contract primarily consist of maintenance dredge materials and are principally mud, silt, soft clay, sand, organic matter, debris, trash, and combinations thereof, but shall include any material found within the area to be dredged. Minor variations in the subsurface materials are to be expected and, if encountered, will not be considered as being materially different and will be included in the dredged materials excavated and disposed as part of this contract.