The Project generally consists of the following: Furnish all labor, materials, and equipment necessary to complete the following work: 1. Construct a new Quail Valley Pump Station as described in the specifications and drawings, including but not limited to the following: a. Site grading, paving, fencing, and landscaping b. Pump station wetwell and 10-horsepower submersible duplex pumps c. Electrical, instrumentation, and control equipment including a standby diesel generator d. Various site piping, including valves e. Precast vaults, basins, and SSMHs f. Metal fabrications 2. Construct a new Quail Valley Sanitary Force Main as described in the specifications and drawings, including but not limited to the following: a. Temporary traffic control b. Trenching, excavation, and dewatering c. Boring and jacking d. Horizontal directional drilling e. HDPE sanitary force main 3. Construct the Oak Village Pump Station improvements as described in the specifications and drawings, including but not limited to the following: a. Temporary bypass pumping b. Demolition of existing improvements c. Wetwell repair including protective coating and leak repair d. Metal fabrications e. Removal and replacement of existing piping, valves, and vaults f. Removal and replacement of existing standby diesel generator g. Electrical, instrumentation, and control equipment