Portland Metro Area 2024-2027 ADA Curb Ramps, Phase 6 Project on Various Highways in Portland. FAP No. SA00(824). ($ 5,000,000 - $ 10,000,000). Req. approx. 4,000 ft2 temp. signs; 25 ea seq. arr. signs; 2,500 hrs flag.; 4 ea flag. sta. light.; 300 ea TCS; 2,000 ft PCD; 212 ea temp. curb ramp; 500 ft2 temp. walks; 133 ea inlet prot.; 546 ton contam. soil disp.; 5 ea soil smpl. coll. & anlt. test.; const. surv. wrk.; 9,700 yd2 rem. surf. curb ramp const.; 10,600 ft asph. pvmt. sawcut.; 2,500 ft conc. sawcut.; 50 ft pipe; 1 ea conc. M.H.; 24 ea adj. box.; 68 ea adj. inlets; 6 ea adj. M.H.; 2,000 yd2 CPPR; 4,600 ton aggr. base; 1,400 ton ACP; 85 ft2 asph. sl. pav.; 18,500 ft2 pvmt. rep.; 10 yd2 pl. conc. pvmt. rep.; 13,400 ft conc. curbs; 700 ft2 conc. islands; 1,000 ft2 conc. drvwy.; 58,000 ft2 conc. walks; 3,650 ft2 trunc. domes; 210 ft thermo. striping; 9 ea xwalk. clos. sup.; rem. & reinstall. extg. signs; 253 fbm wood sign post; 5.4 yd3 conc. in sign sup.; 2,095 lb st. in sign sup.; 16 ea traf. sig. mod.; 0.3 acre seeding; 170 yd3 topsoil; 60 yd3 brk. mulch; 1,500 ft2 weed ctrl. geot.; 80 ft rem. & reinstall. fence. Completion Time: September 24, 2027. Class of Work: Miscellaneous Highway Appurtenances. THIS PROJECT CONTAINS FUEL ESCALATION CLAUSE. THIS PROJECT CONTAINS A 15% DBE GOAL. PROJECT MANAGER: JAY DAVENPORT, EMAIL: JAY.DAVENPORT@ODOT.OREGON.GOV