Contract Section I: - Pipe bursting approximately 3,100 linear feet of damaged clay pipe with 12” HDPE sewer main, and dig and replace approximately 650 linear feet of damaged clay pipe with 12” PVC (SDR26) sewer main. This project also includes reconnections of sewer services using 4” and/or 6” PVC installed to match existing service grades. - Removing and replacing approximately 19 manholes, along with pump-around system. - Approximately 120 linear feet of highway bore along with city street repair along the entire project. Contract Section II: - Replacement of existing aeration system with new aeration equipment, stainless steel air piping, blowers, mixers, control building, metering and protective cover over UV disinfection equipment.