Contractor to furnish all materials, labor, equipment, and appurtenances to rehabilitate Ground Storage Tank (GST) No. 1 (90'Ø x 24'H) and No. 2 (93'Ø x24'H) by power wash, abrasive blast, and recoat interior and exterior surface, including associate piping and appurtenances, seal perimeter of ground storage tank joint to ring wall, remove and replace two (2) roof hatches per tank, and install fourteen (14) new shell vents per tank; remove and replace GST No. 1 roof panels, supporting rafters, and appurtenances; rehabilitate Hydropneumatic Tank No. 1 and No. 2 by power wash, abrasive blast, and recoat interior and exterior surface, including associate piping and appurtenances, apply sealant to saddles at concrete footing, remove and replace equipment box; remove and replace existing cathodic protection with horizontal cathodic protection on GST No. 1 and GST No. 2 including cap and seal weld all existing hand holds from existing cathodic protection; power wash, hand tool and/or power tool clean, abrasive blast and recoat exterior wall surface of MCC building, generator enclosure, bollards, and aboveground piping; in accordance with the plans and specifications. Complete in place.