0010 2401-6745625 REMOVAL OF EXISTING BRIDGE LUMP SUM LUMP SUM _________._____ 0020 2402-2720000 EXCAVATION, CLASS 20 CY 690.000 _________._____ _________._____ 0030 2403-0100010 STRUCTURAL CONCRETE (BRIDGE) CY 555.700 _________._____ _________._____ 0040 2403-1000005 FIBER REINFORCEMENT FOR STRUCTURAL CONCRETE CY 325.900 _________._____ _________._____ 0050 2403-1000010 TRIAL BATCH AND TEST PLACEMENT (FIBER REINFORCED CONCRETE) LUMP SUM LUMP SUM _________._____ 0060 2404-7775000 REINFORCING STEEL LB 27,118.000 _________._____ _________._____ 0070 2404-7775005 REINFORCING STEEL, EPOXY COATED LB 100,741.000 _________._____ _________._____ 0080 2404-7775009 REINFORCING STEEL, STAINLESS STEEL LB 4,100.000 _________._____ _________._____ 0090 2407-0562845 BEAMS, PRETENSIONED PRESTRESSED CONCRETE, BTB45 EACH 14.000 _________._____ _________._____ 0100 2407-0562905 BEAMS, PRETENSIONED PRESTRESSED CONCRETE, BTB105 EACH 7.000 _________._____ _________._____