System 001 Rehabilitation includes the installation of approximately 7,999 linear feet of new corrugated polyethylene pipe (CPEP) in various diameters (12", 18", 24", 30", and 36"). Additionally, 1,059 linear feet of cured-in-place pipe (CIPP) will be furnished and installed (826 LF of 18" and 233 LF of 36"). The work also includes the installation of 13 new storm drain structures—comprising Type I and II manholes and catch basins—and work to furnish and install 3 cured-in-place manholes (CIPM). The scope further includes the removal of 2 manholes and 5 field inlets, abandonment of 8 manholes and approximately 2,286 linear feet of existing pipe, manhole maintenance, cleaning of pipes and manholes, and associated paving and surface restoration. System 002 Rehabilitation involves the installation of approximately 2,388 linear feet of new CPEP and work to furnish and install 424 linear feet of CIPP. Four new cured-in-place manholes (CIPM) will also be furnished and installed. The work includes removal of 1 headwall and approximately 391 linear feet of existing pipe, abandonment of 60 linear feet of 36" CPEP, manhole maintenance, pipe and manhole cleaning, and associated paving and surface restoration.