The specifications listed below set forth the necessary requirements: Provide labor, material, and equipment: 1. 1 Oil Fired Boiler 2. Brand of primary Boiler shall be Well-McLain or equivalent 3. Beckett Oil Burner or equivalent 4. 2 circular pumps (one being a backup); The work will consist of the following: 1. Mobilization on site 2. Install temporary protection as needed 3. Remove existing boiler and dispose of material 4. Patch/Parge existing masonry (if needed) 5. Install new oil boiler 6. Install associated plumbing, glycol, temperature gauges and expansion tank 7. Install structural concrete grout and masonry if needed 8. Bidder shall be responsible for obtaining all permits required and any associated costs 9. New oil lines from boiler to concrete oil tank located outside 10. All work must be completed by December 5, 2025