Project consists of the construction of a new Los Angeles Department of Water and Power (LADWP) 34.5 kV Industrial Station, new 34.5 kV switchgear, new 18 MVA transformer equipped with Automatic Load Tap Change (ALTC) to automatically adjust the necessary transformer tap changes under load, new 11 kV AMP switchgear, 2 new 11 kV wharf AMP outlets, and a 11 kV AMP mobile cable management for cruise ships connections. In addition, this Project requires the extension of a new LADWP 34.5 kV circuit through the existing LADWP underground conduit (from 22nd Street to Berth 49 along Miner Street). Project also includes Berths 49 - 50 wharf structural AMP, landside structural AMP support, Berths 49 - 50 concrete wharf repairs, furnish and install hybrid fender backing panel including steel pipe piles and timber piles, new foam-filled fendering system, new utilities including water lines and sewer connections, customer requested civil improvements to improve pedestrian and vehicular access, safety, and security for the cruise customers and operations, and site removals.